Yemen News Agency (SABA)
Home      Local   International   Reports   About Yemen   Tourism   Civil Society   Economic   About Saba  
Search | Advance Search
 
  Local
Czech PM Deputy in Yemen
[20 May 2013]
PM meets Qatari diplomat
[20 May 2013]
PM receives letter from FAO Director-General
[20 May 2013]
President receives congratulations on 23rd National Day
[20 May 2013]
Yemen partakes in 2nd meeting of DGCA-MID in Jeddah
[20 May 2013]
 
  Reports
UNSC Presidential Statement
[16 February 2013]
In biggest ever cleaning campaign, over 200,000 volunteers clean Sana'a
[11 December 2012]
Save the Children provides life-saving services to Yemeni families
[08 September 2012]
On Women’s Day, Remember Our Arab Sisters
[08 March 2012]
International Women Day: Yemen revolution and women
[08 March 2012]
 
  International
Car bomb hits police chief in Iraq's Kirkuk, 2 killed
[23 May 2011]
S.Korea opens trial of 5 arrested Somali pirates
[23 May 2011]
Obama: US to help maintain Israel's qualitative military edge
[23 May 2011]
Tornadoes hit central U.S., killing at least 30
[23 May 2011]
Israeli Forces Arrests Six Palestinians
[17 May 2011]
  Economic
Yemen, WB discuss grant draft for roads maintenance
[27/August/2012]

SANA’A, Aug.27 (Saba)- Yemen and the World Bank (WB) discussed here on Monday a draft grant from the Bank for the implementation of rural roads as well as the maintenance of roads in the provinces of Amran and Hajjah at a total length of 360km.

This came during the meeting of Minister of Public Works and Roads Engineer Omar Al-Kurshmi with the WB’s representative for environmental and infrastructure projects Engineer Ibrahim al-Dajani.

In the meeting, the two sides touched upon the grant provided by the WB to the Yemeni government for the maintenance of 250 km in a number of provinces, the most important of which are Hodeidah,Taiz, and Ibb wth $ 40 million.

The visit of the Bank’s delegation headed by Engineer al-Dajani aimed to complete the preparatory work related to the project referred to, as well as some other projects being implemented, particularly with regard to the work of studies, designs and bids procedures and selection of consultants in preparation for submitting it to the WB’s management to give the final consent.

BA
Saba
  more of (Economic)
UPDATED ON : Mon, 20 May 2013 19:45:47 +0300